The wood power plant in Dornbirn was built in 2014 with a construction period of only three months and was successfully connected to the grid by the end of 2014.

The plant type CW700-200 has a thermal capacity of 650 kW and produces 180 kW electrical and more than 350 kW thermal power.   It makes use of commercially available, dried wood chips (G30 / G50), including barks and fines. The power generation of the product gas takes place in an agenitor 406 gas engine of 2G with an electrical efficiency of 40 %.