Vierschach / IT

Wood power plants

The biomass cogeneration plant CW1000-300 was built 2011/12 in addition to an existing biomass district heating plant in Innichen...

Schwaz / AT

Automation

Delivery of the entire process control system including sensors, switch cabinets, bus terminal boxes and wiring. This system is used for electrical and thermal...

Schwaz / AT

Process engineering

This filter was designed for a gasification pilot plant in 2009 and filters out 300 m³/h product gas at a temperature of 500 °C. The plant is still using the original...

Schwaz / AT

Automation

Changeover of all PLCs to the modern Siemens Simatic S7 controller during the ongoing operation. The whole...

Dornbirn / AT

Process engineering

The secured afterburning of lean gases is a special challenge that makes appropriate gas flares indispensable...

Vierschach / IT

Process engineering

This scrubber was developed and implemented as a cooler but also as a separator for ammonia and hydrogen sulphide for a stepped floating bed carburetor. The condensate...

Jenbach / AT

Process engineering

This hot gas filter was developed in 2008 for a thermo-chemical test facility from GE Jenbacher and uses ceramic...