Innsbruck / AT

Wood power plants

The turbo-charged CHP unit with 8 cylinders and 16.7-liter capacity already achieved an electrical output of 300 kW in the first week after commissioning in November 2016.

Schwaz / AT

Process engineering

The secured afterburning of lean gases is a special challenge that makes appropriate gas flares indispensable...

Dornbirn / AT

Wood power plants

The wood power plant in Dornbirn was built in 2014 with a construction period of only three months and was successfully connected to the grid by the end of 2014.

Strass im Zillertal / AT

Automation

Changeover of all Siemens S5 controllers to the modern Siemens Simatic S7 controllers during the ongoing operation. All communications...

Schwaz / AT

Process engineering

This scrubber was developed and built as a cooler but also as a separator for ammonia and hydrogen sulfide for a graded floating bed gasifier.

Vierschach / IT

Wood power plants

The biomass cogeneration plant CW1000-300 was built 2011/12 in addition to an existing biomass district heating plant in Innichen...

Schwaz / AT

Automation

Delivery of the entire process control system including sensors, switch cabinets, bus terminal boxes and wiring. This system is used for electrical and thermal...

Schwaz / AT

Process engineering

This filter was designed for a gasification pilot plant in 2009 and filters out 300 m³/h product gas at a temperature of 500 °C. The plant is still using the original...

Schwaz / AT

Wood power plants

The biomass co-generation plant "Alpha" was founded on site of Stadtwerke Schwaz in 2009 and has since served as a development platform for the SYNCRAFT technology...

Schwaz / AT

Automation

Changeover of all PLCs to the modern Siemens Simatic S7 controller during the ongoing operation. The whole...